ric-energy-north-america-green-logo-clean-energy-company-brand
LandownersCommunities
  • What We Do
    Projects
    Solar Energy
    Battery Storage
    Green Hydrogen
  • About
    About Us
    Our Team
    Careers
    News
  • North America
    Europe
Contact Us

Allegany Solar

Project Type:
Community
Size:
5 MW AC
Stage:
In Development
Allegany
County

Allegany Solar Project

Bringing Clean Energy to Allegany County

‍

________________________________________

About the Proposed Project

Allegany Solar (Allegany PV, LLC) is a 5 MW community solar project under development at 19237 McMullen Highway SW in the town of Rawlings, Maryland. The Project is currently under review by the Maryland Public Service Commission to receive a Certificate of Public Convenience and Necessity (CPCN) permit.

The Project will use ground-mounted photovoltaic (PV) panels, interconnect with Potomac Edison, and provide access to solar energy to participants in Maryland’s community solar program. In addition to providing Allegany County with a new source of clean and cost-effective energy, the Project will create jobs, prompt local investments, and increase local tax revenue.

‍

________________________________________

‍

Location:

The Project site is nestled in a wooded area of north of McMullen Highway and west of Conda Way, located on roughly 40 acres of privately leased land. We plan to leave a substantial buffer of deciduous and evergreen trees to shield the Project from view from all directions: immediate neighbors of the Project should not be able to see it. The parcel currently sits unused, so the Project will not displace farmland or residential areas.  

The Project will interconnect to a 34.5kV sub-transmission line that already runs through the parcel. It also sits next to a natural gas pipeline. As such, the Project will be consistent with neighboring use while providing minimal disruption to community character.

‍

Key Numbers

  • 5 MW across 40 acres
  • 50 jobs created during construction
  • $3 million in new tax revenue projected over 25 years
  • 20,500 tons of fossil fuel emissions reduced annually
  • 250 households powered by community solar

‍

________________________________________

‍

Estimated Timeline:

  • February 2026: First Public Hearing
  • May 2026: Federal & State Agency Review
  • August 2027: Second Public Hearing
  • December 2026: Permit Granted
  • April 2027: Start of Construction
  • September 2027: Permission to Operate

‍

________________________________________

Important Notice (February 2026)

‍

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

IN THE MATTER OF ALLEGANY PV, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND CASE NO. 9842
‍

NOTICE OF PRE-HEARING CONFERENCE

A pre-hearing conference in the above-entitled matter is scheduled for Thursday, March 5, 2026, at 10:00 a.m., via virtual platform, concerning Allegany PV, LLC’s application for a certificate of public convenience and necessity to construct a 5 MW solar photovoltaic generating facility in Allegany County, Maryland.

Barring technical difficulties, anyone wishing to observe the live stream of the hearing may do so via the Public Utility Law Judge Division’s YouTube channel, https://bit.ly/2X6wLiP. At the pre-hearing conference, any preliminary matters will be discussed, and the establishment of a procedural schedule.

Petitions to intervene must be filed by Tuesday, March 3, 2026, and may be filed electronically through the Commission’s website at www.psc.state.md.us, or by first-class mail with the Commission’s Executive Secretary, Andrew S. Johnston, Maryland Public Service Commission, 6 St. Paul Street, 16th Floor, Baltimore, MD 21202, and must reference Case No. 9842.

Paper filings are no longer required for e-filings, and allentities are strongly encouraged to avail themselves of the e-file system.Instructions for e-filing are found under the “E-file” section of the Commission’s website under the “Learn More” link, which can be accessed via the following link: https://webpscxb.psc.state.md.us/DMS/E-file.  

‍

Previously Held Public Meetings:

‍

Dates:

Tuesday, December 2, 2025 at 6:30 PM

Wednesday, December 3, 2025 at 4:30PM

Location:

‍Frostburg Branch of Allegany County Public Library

Address:

65 E Main Street, Frostburg MD 21532

‍

________________________________________

‍

Connect With Us

RIC Energy is dedicated to supporting communities that are home to our renewable energy projects across North America. Your local RIC Energy representative is:

‍

Conrad Karsten, Development Project Manager

Phone: (917) 426-8763

Email: ckarsten@ric.energy

‍

Project updates are available on Instagram and X

Back To All Projects

Share This Project

Delivering sustainable energy projects to meet communities’ rising demand. Join us.

Privacy PolicyLegal Notice
Cookie Preferences
RIC Energy
About UsLandownersCommunitiesOur Team
Resources
NewsProjectsCareersContact Us
Technology
Solar EnergyBattery Energy StorageGreen Hydrogen
Location
17 State St, Suite 2320
New York, NY, 10004, USA
Contact Us
communications.na@ric.energy332.222.8077
332.222.8077
Follow Us
ric-energy-north-america-brand-mark-icon-representing-clean-energy-company-logo-and-identity
RIC Energy Europe
Ⓒ RIC Energy 2026